On July 31, 2026, Puerto Rico’s Office of Permit Management (Oficina de Gerencia de Permisos, or OGPe) issued a 120-page decision approving the Consulta de Ubicación for the proposed Esencia development in Cabo Rojo.
The scale of the project and the questions it raises about land use, water, infrastructure, and natural resources make it an issue that deserves attention and informed public discussion.
As part of NACOPRW’s commitment to informed advocacy, we are beginning a series examining the public documents and issues surrounding Project Esencia. We begin with OGPe’s decision: what is proposed, what was approved, and what still remains to be decided.
What did OGPe actually approve?
OGPe approved Consulta de Ubicación No. 2026-693109-CUB-013470, covering the proposed land uses, zoning changes, conceptual subdivision, and development parameters for Project Esencia. But the decision does not mean that every part of Esencia is now approved for construction. The plans approved by OGPe represent the project’s conceptual design. Additional permits and authorizations are still required for construction and major infrastructure, including groundwater extraction, wells, and water and wastewater facilities. The decision also states that if later studies identify substantially different groundwater capacity, limitations on the proposed water supply, or adverse effects on surrounding communities, irrigation systems, or agricultural activities, the matter must return to OGPe for further consideration.
What is Project Esencia?
Esencia is a proposed residential and tourism development along PR-301 in Boquerón, Cabo Rojo. According to OGPe, the project covers 78 parcels totaling approximately 1,437.5 cuerdas and would be developed in four phases.
Plans include:
- 307 hotel rooms
- 1,070 tourist residences
- Two golf courses
- A school with dormitory capacity for 500 students
- Medical, commercial, entertainment, and recreational facilities
- Two town centers
- Four public vehicular beach access points with parking, restrooms, and pedestrian access
How much land would be developed?
Approximately 151 cuerdas are identified as maritime-terrestrial public domain.
Of the remaining approximately 1,286.5 cuerdas, the decision states that at full development:
- 22.7% would contain structures and impermeable surfaces
- 26.9% would be designated conservation areas
- 50.4% would remain open and permeable
The decision also states that approximately 50% of the overall property is classified as specially protected ecological rustic land (SREP-E) under Puerto Rico’s Land Use Plan.
How would Esencia get water and utilities?
Esencia does not propose relying on Puerto Rico’s public systems for most of its water, wastewater, or electricity needs.
Water: The project estimates maximum potable-water demand of approximately 1.25 million gallons per day. Its proposed private water system would draw groundwater from wells on the property, with approximately 1.5 million gallons per day of raw groundwater extraction anticipated for treatment.
Wastewater: The project could generate approximately 1.3 million gallons of wastewater per day. Esencia proposes its own treatment facility, with treated water reused for non-potable purposes.
Electricity: The project proposes a private microgrid with solar generation, battery storage, backup generation, and an estimated maximum demand of approximately 12 megawatts.
Each of these systems remains subject to additional permitting and regulatory requirements.
What did government agencies say?
OGPe’s decision includes comments and recommendations from Puerto Rico and federal agencies.
Among them:
- DRNA requested changes that resulted in portions of the project being redesigned, including expanded buffers and protections for mangroves, wetlands, and natural corridors.
- The U.S. Fish and Wildlife Service raised concerns about endangered species and ecological corridors.
- The Puerto Rico Institute of Culture identified the need for additional archaeological evaluation.
- The Highway and Transportation Authority determined that expansion of PR-100 must be operational to accommodate additional traffic from the project.
- The Department of Agriculture raised concern about potential competition for water and electrical resources with nearby agricultural activities.
This is one part of a much larger public record surrounding Project Esencia. NACOPRW will continue examining that record in this series, focusing on specific issues and decisions as the project moves forward.